2-Inch Water Main Replacement Projects

The City has identified as a priority, the need to replace several miles of substandard 2-inch  potable water mains currently in service throughout the City.  Most of the 2-inch water mains were installed more than 30 years ago and are beyond their useful service life. A large portion of these 2-inch water mains are constructed of galvanized steel which is subject to corrosion and failure, as such, substandard water quality is an issue in many of the areas served by these mains. Replacement of the 2-inch water mains was identified in the City's 2007 utility master plan update which indicated that approximately $11,250,000.00 of substandard 2-inch water mains should be replaced. In 2011, the City's 5-year Capital Improvement Program specifically identified $6.6 million to be spent on replacement of the 2-inch water mains over the next 5 years. The project was shown to occur in three phases; in 2013, the first phase of this work was undertaken with $2,650,000 divided over three separate projects, one focusing on watermain replacement on those highest priority streets on the Mainland, and one each focusing on the highest priority streets on the North and South Peninsula.  During the current Fiscal Year, the City has budgeted $2,940,000.00 in funds to address watermains deemed next highest priority.  This year’s work has again been broken into projects defined by geographic region.

Mainland

View Construction Schedule for Mainland

This map shows streets in this phase of work which will have water mains replaced on the Mainland. Prior to work starting on each street notices will be handed out to each residence to inform them when the work will be starting and who to contact should any issues arise once the work commences. 

The Contractor for the project is: J.D. Weber Construction Co:  (386) 212-1989
The City Inspector for the project is:  Donnie Vick (386) 290-8382

South Peninsula 

View Summary and Construction Schedule for South Peninsula 

This map shows streets in this phase of work which will have water mains replaced on the Peninsula, within the limits of the City of Ormond Beach.  Prior to work starting on each street notices will be handed out to each residence to inform them when the work will be starting and who to contact should any issues arise once the work commences. 

The Contractor for the project is:  Young’s Communications Co., Inc. (Y-COM): (321)723-6025
The City Inspector for the project is:  Art Ross (386) 290-8382

North Peninsula

View Summary and Construction Schedule for North Peninsula

This map shows which streets will have water mains replaced on the north peninsula north of the limits of the City of Ormond Beach for this phase of work.  Prior to work starting on each street notices will be handed out to each residence to inform when the work will be starting and who to contact should any issues arise once the work commences.  

The Contractor for the project is:  General Underground, LLC. (352) 493-7782
The City Inspector for the project is:  Art Ross (386) 290-8382