2-Inch Water Main Replacement Projects

The City has identified as a priority, the need to replace several miles of substandard 2-inch potable water mains currently in service throughout the City.  Most of the 2-inch water mains were installed more than 30 years ago and are beyond their useful service life. A large portion of these 2-inch water mains are constructed of galvanized steel which is subject to corrosion and failure, as such, substandard water quality is an issue in many of the areas served by these mains.  Replacement of the 2-inch water mains was identified in the City's 2007 utility master plan update which indicated that approximately $11,250,000.00 of substandard 2-inch water mains should be replaced. In 2011, the City's 5-year Capital Improvement Program specifically identified $6.6 million to be spent on replacement of the 2-inch water mains over the next 5 years. The project was shown to occur in three phases with $2,650,000 to be spent in the first phase to occur from FY 2011-12 through FY 2012-13.

South Peninsula 

View Construction Schedule for South Peninsula 

This map shows shows streets which will have water mains replaced in the south peninsula section of the City for this first phase of work.  Prior to work starting on each street notices will be handed out to each residence to inform them when the work will be starting and who to contact should any issues arise once the work commences. 

The Contractor for the project is:  McMahan Construction (386) 734-1071
The City Inspector for the project is:  Art Ross (386) 290-8382

North Peninsula

View Construction Schedule for North Peninsula

This map shows which streets will have water mains replaced in the north peninsula section of the City for this first phase of work.  Prior to work starting on each street notices will be handed out to each residence to inform when the work will be starting and who to contact should any issues arise once the work commences.  A summary of the project can be found here.

The Contractor for the project is:  THADCON, Inc. Construction - (386) 253-3963
The City Inspector for the project is:  Art Ross (386) 290-8382